Value stream mapping theory and lean principles.

What is value stream mapping?

A one-page explanation of value stream mapping - what it is, where it came from, and what it's actually good for.

18 views

The 8 wastes (TIMWOODS)

The eight categories of waste in Lean - Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills.

18 views

Cycle time vs wait time

The distinction that makes value stream mapping useful - and why wait time usually dwarfs cycle time.

13 views

Takt time

Takt is the beat of customer demand. Every stage that's slower is a bottleneck; every stage that's faster is over-producing.

20 views

Process Cycle Efficiency (PCE) explained

PCE tells you what proportion of your lead time is actually value-adding. If it's below 10% you have a flow problem.

14 views

Lead time, cycle time, and throughput

Three related but distinct measures. Confusing them is one of the most common VSM mistakes.

7 views

Building a current-state map

The current-state map is the honest picture of how the process runs today. Get this right or the rest is useless.

7 views

Building a future-state map

Future-state maps are hypotheses. They need to be specific, sequenced, and testable.

6 views

Value-Add, Non-Value-Add, and Incidental work

A three-way classification is more useful than a binary VA/NVA split. Learn where incidental work fits.

7 views

Standard work

Standard work is the current best-known way to do a task. Not a straitjacket - a baseline for improvement.

7 views

The Gemba walk

Go and see. The single most important habit in Lean, and the one most often faked from a conference room.

8 views

5S - workplace organisation

Sort, Set in Order, Shine, Standardise, Sustain. Boring, unglamorous, and the foundation of every good Lean transformation.

6 views

Root cause analysis basics

Symptoms are easy to spot. Root causes take discipline. Two techniques that reliably get you there.

7 views

The 5 Whys

The simplest root-cause tool. Ask why. Then ask why to the answer. Repeat until you can't.

6 views

Running a kaizen event

A kaizen event is a focused, time-boxed improvement effort. Done well, it moves a process in days that would otherwise take months.

7 views

DMAIC problem-solving framework

Define, Measure, Analyse, Improve, Control - the classic Six Sigma problem-solving cycle.

5 views

OEE - Overall Equipment Effectiveness

OEE is the standard measure of how well a station or line is performing against its potential. Availability x Performance x Quality.

7 views

SMED - Single-Minute Exchange of Die

Shigeo Shingo's technique for reducing changeover time - typically by 50-90% - without buying new equipment.

6 views

Kanban systems

Visual signals that trigger work. The mechanism that makes pull production work in practice.

7 views

Line balancing

Distribute work across stations so each takes roughly the same time. The prerequisite for smooth flow.

6 views

Bottleneck analysis

The Theory of Constraints in one page. Find the constraint, exploit it, subordinate everything else to it, elevate it, repeat.

6 views

Spaghetti diagrams

Draw the actual path an operator or work item takes through a space. You'll be shocked.

6 views

A3 problem-solving

Distill a whole problem-solving effort onto one A3 page. Forced brevity is the discipline.

7 views

Process capability

How well does your process meet spec? Cp, Cpk, and why they're not the same thing.

6 views

PDCA - Plan, Do, Check, Act

Deming's improvement cycle. The mental model behind almost every Lean and quality practice.

8 views